Jim’s Story: VENDLET Repositioning System, Suffolk October 25, 2017 His mood lifted as he felt secure, and improved positioning reduced Jim’s pain levels, pressure areas and respiratory distress...
Gina’s Story: VENDLET Repositioning System, West Berkshire October 25, 2017 "I am very pleased to report that the VENDLET trial is a resounding success!..."
Wendy’s Story: VENDLET Repositioning System, Dorset October 25, 2017 ...for a lady where we needed three carers to roll her which was an extremely painful and frightening process...
Ollie’s Story: VENDLET Repositioning System, Suffolk October 25, 2017 We would like to thank you very much for arranging the allocation of the VENDLET to use for my...
Mary’s Story: VENDLET Repositioning System, Berkshire October 25, 2017 Mary reported that the system was working well and that after two days of getting used to it, she...
Thorpe St Andrew High School October 25, 2017 Felgains were chosen to design and install this Voyager 420 ceiling track hoist system to provide access anywhere within...